01 · Construction / Project Management / SaaS
Labour Management
End-to-end design of a connected labour management workflow, from worker allocation and site attendance to wages, overtime, and real-time project visibility.
- Services
- Product Design, UX/UI, UX Research
- Year
- 2026
- Category
- Construction / Project Management / SaaS
- Client
- IntoAEC
Introduction
Connecting labour management to project progress
Construction projects depend on hundreds of people working across different sites, activities, and timelines. At IntoAEC, Site Supervisors were responsible for managing this workforce, while Project Managers needed visibility into how labour availability was affecting the overall project.
But much of this information was still being maintained manually.
Supervisors had to track who was present or absent, which workers were assigned to which site, calculate wages, manage overtime, and communicate updates back to Project Managers.
The brief was to rethink labour management as part of the larger IntoAEC ecosystem rather than as a standalone attendance tool.
The opportunity was to connect what was happening on-site with what the rest of the project needed to know.
Overview
Understanding the workflow first
I was given the existing labour-management requirements and worked with Project Managers and Site Supervisors to understand how workforce information was currently being captured and communicated.
Before designing the experience, I wanted to understand:
The goal was not simply to digitize attendance. It was to understand how one site-level action could contribute to the larger project workflow.
- How supervisors track daily attendance
- How workers are assigned across sites
- How wages are calculated
- How overtime is recorded
- How labour information reaches Project Managers
- Where the existing workflow creates repetitive manual work
Research
Research & user interviews
I conducted discussions and interviews with Project Managers and Site Supervisors, along with product demos and workflow mapping, to understand the existing process.
A recurring theme emerged: site teams were recording information, but the information was not connected to the rest of the project.
What I heard
Attendance wasn't just an HR activity. It was a source of real-time project information.
- Attendance had to be manually recorded every day.
- Supervisors didn't always have a clear view of which workers were assigned to which site.
- Wages had to be calculated based on attendance.
- Overtime required separate tracking.
- Project Managers depended on manual updates to understand workforce availability.
DESIGN
One action, multiple outcomes
The core structue was to turn attendance into a connected project input. We managed to design the experience to ensure that the attendance module is connected it with other important modules:
Mark attendance → Update worker status → Update labour records → Calculate working days / wages → Record OT → Update project visibility
- Worker allocation
- Site attendance
- Wages
- Overtime
- Project scheduling
- Project Manager visibility
Site attendance
Making daily attendance faster
Site Supervisors could view workers assigned to a project and mark them Present / Absent directly within IntoAEC.
Open Site → View Workers → Mark Attendance → Done
This reduced the repetitive information supervisors needed to maintain manually. But Site Supervisors aren't sitting at a desk — they are on the construction site. So attendance needed to work where the work was actually happening.
Mobile
Mobile attendance
I extended the attendance workflow to the IntoAEC mobile experience so supervisors could record attendance directly from the site. The mobile experience focused on:
This shifted attendance from an end-of-day administrative task to a real-time site activity.
- Quickly viewing assigned workers
- Marking Present / Absent
- Updating attendance on-site
- Minimizing navigation
- Making frequent actions easy to access
Scheduling
Connecting labour to project scheduling
The schedule represents what is planned. Attendance represents what is actually happening on-site. Connecting the two created a more useful picture for Project Managers.
Attendance → Workforce Availability → Project Schedule → PM Visibility
If an activity requires a specific workforce, attendance can help PMs understand whether the required workers are actually available on-site — instead of waiting for manual updates.
Wages & OT
Managing wages & overtime
Attendance also formed the foundation for labour cost management. Worker records could be connected with working days, wage rates, attendance and overtime — reducing the need for separate records.
Construction projects often require workers to go beyond regular hours, so I introduced the ability to record OT directly against individual workers.
Attendance → Working Days → Wages + OT → Labour Cost
Design system
Design system & components
I created reusable components and states to maintain consistency across the web and mobile experiences. Key components included:
- Worker cards
- Present / Absent states
- Attendance controls
- Worker status
- Wage information
- OT controls
- Site assignment states
- Schedule indicators
Decisions
Key design decisions
- Attendance at the source — record information where work happens instead of relying on later manual updates.
- Mobile-first site interaction — supervisors spend most of their time on-site.
- Connected attendance and scheduling — attendance became a signal for project visibility.
- Worker-level OT tracking — overtime recorded against individual workers.
- Connected wage information — attendance as the foundation for labour-cost tracking.
- Minimal data entry — built around frequent site actions, not admin work.
Challenges
Challenges & solutions
- Manual site workflows — simplified into a quick Present / Absent interaction on-site.
- Different user contexts — Site Supervisors on mobile, Project Managers on web.
- Disconnected information — attendance connected with scheduling, worker records, wages and OT.
- Constantly changing projects — allocation, attendance and OT can be updated as conditions change.
- Avoiding another data-entry tool — capture once and let it flow into other workflows.
Impact
What changed
The redesigned Labour Management experience helped:
It connected a previously isolated site activity with the wider project ecosystem.
- Reduce manual attendance tracking
- Improve visibility of workers across sites
- Simplify wage and OT management
- Give PMs more current workforce information
- Connect site activity with project scheduling
- Increase engagement with IntoAEC among Site Supervisors and Project Managers
Outcome
The real problem was disconnected information
The original problem looked like an attendance problem. But the research revealed something larger.
A worker being marked present is useful on its own, but its value increases when that information also contributes to wages, overtime, workforce availability, scheduling, and project visibility.
Capture information once at the source, then let the entire project benefit from it.
Prototype
Interactive prototype
The interactive prototype demonstrates the complete labour workflow:
Project → Assigned Workers → Attendance → Worker Details → OT → Wage Information → Project Schedule
Impact
Learnings
- A single action at the source can power many downstream decisions.
- Design for where the user actually works — for supervisors, that's the site.
- Connecting workflows beats digitizing them in isolation.